Machine maintenance
 
Saw the bed gearing, high operation items
¡¡¡¡1,The band saw bed should install on the concrete structure foundation fix by a feet bolt, the department is is slightly high in forepart after shoulding insure while adjusting the tool machine level, in order to in cool off the liquid to circulate back to cool off the liquid box smoothly in.
¡¡¡¡2,Should to cool off to join the cooling liquid that the adequacy goes together with the ratio in the liquid box, the comparison presses for the general hour of material 1:30( the appropriation slices to pare the liquid and comparison of waters), difficult the harder material that slice to pare press 1:20 carry on prepare.
¡¡¡¡3,Confirm the power supply conjunction intact after, open a cover, press tool machine to start the button, check the band saw rotation to whether right.
¡¡¡¡4,Saw before slice should according to material of diameter and material choose the saw of the fit eminence stanza, check against the front-panel of the parameter watch adjust the line speed of saw and enter to the speed, and adjust the steel wire to brush a box, making the steel wire brush the round to get in touch with to the band saw 2/3 eminences of eminence.
¡¡¡¡5,Saw a first time usage lately the hour must carry on whet to match to slice to pare, must saw of line speed and enter to the half that the speed declines to go to slice to pare the appearance parameter normally, and saw to slice 5 diameters as 200 mms or slice complete slice of pare the area very at least.
¡¡¡¡ 6,Tool machine detection vibration or excrescent sound, should shut down the check immediately, confirming to have no breakdown rear can re- start the tool machine.
The maintenance of the band saw bed and maintain

¡¡¡¡1,Saw everyday before slice maintain the operation:
A,Check the liquid presses the oil and cools off the liquid to face height, shortage hour is the request height.
B,Check the band saw, insure it has already is risen rightly tight at the lord, passive round up, and clip to hold in left and right direction hand.
C,Check the steel wire brush with a contact of band saw whether fitting, if the steel wire round wears away and should replace in time.
D,each lubrication order, glide the match faces and should encourage lubrication.
¡¡¡¡2,Maintain every week:
A,The band saw equip, saws a to connect the stalk, main and passive bearings, lord to spread to move the pole bearings etc. notes the oil to order to add the full butter lubrication.
B,The clearance cools off the box inside accumulate the scraps and the filth on the filter nets.
¡¡¡¡3,The half a year maintain:
A,Check the bearings of a direction of band saw hand, if wear away the severity and must replace.
B,Replace the lubricant within a box of ( N320#)
C,Replace the liquid to press the liquid in the fuel tank to press the oil, the beard is pure to clean the filth in the box while changing the oil.

Saw the difficulty problem and solutions of pare the medium emergences
A,Saw to pare produce to compare to vibrate greatly
B,Saw to pare to break off or can't saw to pare
C,The band saw a life span shortens obviously
D,Saw to pare the surface too or flection
E,Break the band saw
A
B
C
D
E
A of band saw is apart from to is not suitable for to be saw to pare a request of work
Saw according to the right choice band saw a ³Ý of a size of work
A
B
C
D
E
The band saw show through run to match
Implement the band saw runs to match the operation
A
B
C
   
An operation of band saw speed is too quick
Lower an operation of band saw speed
     
D
E
An operation of band saw speed is too slow
Raise an operation of band saw speed
A
 
C
D
E
The steel wire brushes to install the position not fitting or wear away
Re- install or replace the steel wire to brush the round
A
 
C
D
 
The band saw shows the exactitude to pack in to lead to the hand inside, or clip too tightly
The check corrects it also
 
B
C
D
 
Was clip to saw the material too hard
Back the fire processing to is saw material
   
C
D
E
Saw to pare the efficiency too quick
Lower to saw to pare the efficiency
A
 
C
D
E
Cool off the liquid insufficiency
Make cool off the liquid to supply well
A
 
C
D
E
Saw the bed neighborhood vibrates the source
Saw the bed gearing keeps off to vibrate the source
A
 
C
D
 
Saw a rise and fall oil urn to invade in the free spirit
Try the row exhausted ir
A
   
D
 
The left direction arm leaves the work piece is too far
Make left direction arm leave close to the work piece
A
B
C
D
E
The or so direction arm did not lock tightly
Tight or so direction arm of lock
A
 
D
 
E
Lead to the hand inside clip the knife piece to wear away or break
Replace
A
B
   
E
A back of band saw direction bearings damage
Replace
 
B
 
D
 
Saw wears away the severity or breaks the
Replace the band saw
A
 
D
 
E
Saw a back touches to saw the round
Adjust passive saw the round, make a back of band saw with saw the round keeps the fitting cleft 0.2-1 mms